Services

Downstream Pipe Balancing Service (DPBS)

Are you looking for a short-term, short notice balancing service at Parkway or Kirkwall?

DPBS is a balancing service designed for Shippers who have very short notice delivery requirements (15 minutes notice) at Parkway/Kirkwall.

This service may be purchased on a stand-alone basis, or may be used in conjunction with an existing storage contract with firm injection/withdrawal parameters. DPBS allows Shippers to submit electronic nominations on a very short notice basis and ensure that their gas supplies closely match their consumption requirements, on a 15 minute basis. DPBS provides Shippers with up to six hours of balancing service at Parkway/Kirkwall. The use of DPBS allows Shippers to minimize downstream balancing costs.

SERVICE INFORMATION

Service Highlights

  • Firm, short notice (15 minutes) intraday balancing service providing a park and loan service at Parkway/Kirkwall
  • Submit electronic nominations for up to 96 notice periods for changes to activity at Parkway or Kirkwall (ability to increase or decrease net exports to TCPL)
  • Shipper can export to TCPL a total quantity equal to its maximum hourly transportation demand. The source of the export can be flowing transportation gas from Dawn, or a withdrawal from DPBS
    • Example
      • Daily firm transportation contract = 100,000 GJ/d
        • Hourly transportation demand = 5,000 GJ/h (100,000 GJ/d divided by 20)
      • Daily firm storage withdrawals = 100,000 GJ/d
        • Hourly storage contract withdrawal demand is 5,000 GJ/h (100,000 GJ/d divided by 20)
      • Total flowing gas on M12 Dawn to Parkway contract at 11:00am = 2,000 GJ/h
      • Total withdrawal from storage contract (at Dawn) at 11:00 am = 0
      • Maximum DPBS withdrawal available from 11:00 am to 12:00 pm = 3,000 GJ/h (5,000 GJ/h transport limit less 2,000 GJ/h flowing gas)
  • Shipper can reduce its exports to TCPL and inject into DPBS
    • Example - use same storage and transportation parameters as above
      • Total flowing gas on M12 to Parkway contract as 11:00 am = 2,000 GJ/h
      • Total injection to storage contract (at Dawn) at 11:00 am = 0GJ/h
      • Maximum DPBS injection available from 11:00 am to 12:00 pm = 2,000 GJ/h (equal to 2,000 GJ/h of flowing gas on transport)
  • Hourly DPBS quantity determined as lesser of hourly transport demand and hourly storage withdrawal demand
  • Shipper submits an hourly profile which specifies the net deliveries to TCPL for each hour (by 15 minute segment)
  • Balance account limits:
    • Maximum Upper limit (storage limit)- plus 3 times Hourly DPBS Quantity
    • Maximum Lower limit (loan limit)- negative 3 times Hourly DPBS Quantity
  • No requirements to reduce balance to zero at any time
  • Shippers are billed monthly for all demand charges
  • Overrun of DPBS (and underlying storage contract) may be provided. Any overrun of an hourly quantity will be considered overrun for the entire gas day

 

NOTE: above service description based on use of DPBS in conjunction with an existing storage contract. Service parameters vary if using stand alone DPBS offering

Receipt & Delivery Points

  • Parkway or Kirkwall

Pricing & Fuel

  • Negotiated price
  • No incremental fuel charges (notwithstanding commodity charges required as per underlying storage and transportation contract)
  • No incremental commodity or variable charges
  • Overrun charges equal to 1.5 times underlying demand storage demand charges

Contract

  • Schedule added to existing executed storage contract
  • Assignable to 3rd parties with a firm storage contract on a temporary or permanent basis. View our standard storage assignment agreement

Contract Term

  • Varying length from 1 storage season to 10 years

Service Eligibility

  • Available to Shippers outside of Union Gas' distribution area - intended to supply Shippers who use FT-SN service on TCPL
  • Available to all Shippers who hold a firm Dawn to Parkway/Kirkwall transportation contract
  • Term of transportation contract must be equal to or longer than term of DPBS contract
  • Hourly quantity of firm transport (daily quantity divided by 20) must be equal to or greater than quantity of DPBS contract

Complementary Services

  • F24-T (Firm All Day Transport)
  • F24-S (Firm All Day Storage)
  • UPBS (Upstream Pipeline Balancing Service)

How to Request Service

Services
HUB Contract Application Form. See your account manager for more information.
Learn more
Dawn Horizon
Sign up today for our newsletter!
Learn more

Back To Top

Copyright 2011 Union Gas Limited